Council roads, public pathways, and parks may be temporarily closed for extended periods due to planned upgrades or maintenance of services and public infrastructure.
Details of temporary extended closures are provided in the table below.
For more information about these closures, or other closures not listed, please contact the Council’s Planning and Development team on 08 8935 9922.
Current and planned works
| Road | Suburb | Work type | Start date Sort descending | End date | Custom |
|---|---|---|---|---|---|
Flinders Park (Woodlake Boulevard) | Durack | Other | |||
Closure details: Soft Fall Replacement | |||||
President Park (McInnis Circuit) | Driver | Third party works | |||
Temple Terrace | Moulden | Public Utility Maintenance | |||
Closure details: Multi stage asphalt road works along Temple Tce between Emery Ave and Baldwin Dr. Reduced to no access to Tilston Ave for the duration of works. Direction: Both directions. Alternating outbound and inbound road closures followed by a full closure of both. Period: Six days 7am to 5pm | |||||
Palmerston Circuit, Hillson Street and The Boulevard | Palmerston-city | Major event | |||
Closure details: Rolling closure for Passage of Christ Re-enactment Parade, starting and finishing at 2 Palmerston Circuit. Period: One night 8pm to 9:30pm | |||||
Inverway Circuit | Farrar | Third party works | |||
Closure details: Full road closure between Roystonea Avenue and Farrar Boulevard for DLI Roystonea duplication works Direction: Both directions Period: Three months | |||||
Woodroffe Avenue and Temple Terrace | Woodroffe | Public Utility Maintenance | |||
Closure details: Road asphalt resurfacing works in two stages at Woodroffe Ave and Temple Tce intersection. Closure of Woodroffe Ave with one open lane through Temple Tce Saturday, left turn and straight through only on Sunday. Direction: No access to Woodroffe Ave in stage one. Left in no left out in stage two. Period: Two Days 7am to 5pm | |||||
Flynn Circuit, Damascene Crescent and Cabrini Street roundabout | Bellamack | Public Utility Maintenance | |||
Closure details: Full closure of the roundabout for road asphalt resurfacing works. Property access may be affected for the duration of works. Direction: All entrances and exits to the roundabout Period: Two Days 7am to 5pm | |||||
Lorna Lim Terrace and Hang Gong Avenue roundabout | Driver | Public Utility Maintenance | |||
Closure details: Full closure of the roundabout for road asphalt resurfacing works. Direction: All entrances and exits to the roundabout Period: Two Days 7am to 5pm | |||||
Palmerston Circuit, The Boulevard, Hillson Street and Mansfield Street | Palmerston-city | Major event | |||
Closure details: ANZAC Day service and march CBD involving closure of multiple roads throughout Palmerston City CBD. Direction: Both directions Period: 5:45am - 10am | |||||
Temple Terrace between Waterhouse Crescent and Driver Avenue | Driver | Public Utility Maintenance | |||
Closure details: Closure of the inbound lanes of Temple Tce from Waterhouse Cres for road asphalt resurfacing works. Direction: Inbound only Period: Two Days 7am to 5pm | |||||
Kriewaldt Circuit between University Avenue and Martin Court | Driver | Public Utility Maintenance | |||
Closure details: Full closure for road asphalt resurfacing works. Direction: Both directions Period: Two Days 7am to 5pm | |||||
Morhen Circuit | Bakewell | Public Utility Maintenance | |||
Closure details: Road resealing works involving the full closure of Moorhen, Crake, Triller and the Boobook/Moorhen intersection. One lane alternating traffic along Shearwater Dr. Direction: Both directions Period: Two Days 7am to 5pm | |||||
Rosebery Drive | Rosebery | Public Utility Maintenance | |||
Closure details: Road resealing works involving the full closure of Rosebery Dr from Lambrick Ave to Raintree St. Road closure involves no access to Flametree, Borobia and Excelsa, and reduced access to Raintree and Hayden. Direction: Both directions Period: Four days 7am to 5pm | |||||